T&EActivities
Documentation andReviews
Test and Evaluation Considerations
DesignateCDT, LDTO, & LOTAReview draft CDD for testabilityDetermine T&E StrategyIdentifytest resourcesDesignate test events for each MS and develop exit criteriaDescribe evaluation methodologyAssess T&E impacts of CONOPS/OMS/MP/ use casesEstablish T&EWIPTIdentify TMRR AS T&E risks/opportunities
Develop TEMPIdentify EMD AS T&E risks/ opportunitiesConduct prototype testingConduct EOAor LUTConduct early Reliability testingProvide projected and observed software maturitymetricsConductT&E tosupport modeling & simulationConductBCA on use of MRTFB facilities
Update TEMPIdentify Production AS T&E risks/opportunitiesConductDT&E& OA on developmental articlesConductcoupon, subsystem, and major system LFT&EConduct cybersecuritytestingPlan/conduct QTPlan/conduct PQTPlan/conduct FATPlan/conduct RGTUpdate models & simulationsEvaluate the system using HWILConduct interoperabilitytesting
Conduct IOT&E on production representative systemComplete FUSL LFT&EPlan andexecuteFOT&E (if required)PlanT&E forPIP or nextincrementConduct FATConductPQT
OA of modifications testingSafety testingReliability improvement testingConduct FATConductQTConduct FOT&E
Acquisition StrategyDraft CDD/CONOPSInitial TEMP, PPP, LCSPCybersecurityT&EstrategyInitial Reliability Growth T&EstrategyASR
System (Performance) specificationCDD/OMS/MP/Use CasesUpdates to TEMP, PPP,LCSPRequestFUSL LFT&E Waiver (if applicablePDR, IPA, ILA
CPDSystem (Performance) and product specificationsInterface Control DocumentsUpdates to TEMP, PPP,LCSPOAR& LFT&EReportCDR, TRR, IPA, ILA
CPDDOT&EIOT&E ReportDOT&E LFT&E ReportFOT&E Report (if required)OA of modifications testing reportsSafety testing reportsReliability improvement testingreportsPCA, OTRR
OA of modifications test reportsSafety test reportsReliability improvement test reports
CPD
B
A
C
MDD
FRP/FD Decision
Dev RFPRelease Decision
IOC
Materiel Solution Analysis
FOC
Technology Maturation &Risk Reduction
Production & Deployment
Engineering & Manufacturing Development
LRIPDecision
ILA/IOT&E
Operations & Support
ICD
DraftCDD
CDD
PDR
CDR
FOT&E
EOA/ILA
ILA/OA
EOA
AS: Acquisition StrategyASR: Alternative Systems ReviewBCA: Business Case AnalysisCDD: Capability development documentCDR: Critical Design ReviewCDT: Chief Developmental TesterCPD: Capability Production DocumentCONOPs: Concept of OperationsEOA: Early Operational AssessmentFAT: First Article TestingFOC: Final Operational CapabilityFOT&E: Follow-on Test & EvaluationFUSL: Full up System Life-fireHWIL: Hardware –in-the-Loop
OTRR: Operational Test Readiness ReviewPCA: Physical Configuration AuditPDR: Preliminary Design ReviewPPP: Program Protection PlanPQT: Production Qualification TestingQT: Qualification TestingRGT: Reliability Growth TestingSEP: System Engineering PlanTEMP: Test and Evaluation Master PlanT&E WIPT: Test & Evaluation Working Level Integrated Product TeamTRR: Test ReadinessReview
ICD: Initial Capabilities DocumentILA: Independent Logistics AssessmentIPA: Independent Program AssessmentIOC: Initial Operational CapabilityIOT&E: Initial operational test & evaluationLCSP: Life-Cycle Sustainment PlanLDTO: Lead Developmental Test OrganizationLOTA: Lead Operational Test AgencyLRIP: Low-Rate Initial ProductionLUT: Limited User TestsMDD: Materiel Development DecisionMRTFB: Major Range Test Facilities BoardOA: OperationalassessmentOMS/MP: Operational Mode Summary/MissionProfile