New LARP Magnet System WBS - indico.fnal.gov

Publish on Category: Birds 0

Agenda
9/10/2018
G. Ambrosio
1
Project updatesMQXFA Acceptance Criteria (DocDB# 1103)Coil/Magnet Handling & ShippingL3 reportsAOB
Handling & Shipping Requirements:OnDocDB: #820 & #838Approval process starting soonNew Coil/Magnet Shipping czar: Maria Baldini
9/10/2018
G. Ambrosio
2
Coil Shipping Plans
Coils are shipped in dedicated fixture/crate, using dedicated truck and with 2 accelerometersby coil L3s (Fred & Jesse)Shipping crate is sent back to the lab that originated the shipmentby magnet L3 (Soren & Dan)Accelerometer data analysis:Receiving L3 checks that shocks <max_acceptableIf not FEM analysis of event is needed to accept/reject coilMaria collects and analyses all accelerometer data
9/10/2018
G. Ambrosio
3
Magnet Shipping Plans
Magnets are shipped in dedicated fixture/crate, using dedicated truck and with 2 accelerometersby magnet L3 after assembly (Dan)by vertical test L3 after vertical test (Joe)Shipping crate stays at BNL during vertical test and is used to ship the magnet to FNALShipping crate is sent back to LBNL from FNALbycoldmassL3 (Sandor)Accelerometer data analysis:Receiving L3 checks that shocks <max_acceptableIf not FEM analysis of event is needed to accept/reject magnetMaria collects and analyses all accelerometer data
9/10/2018
G. Ambrosio
4
Maria is going to monitor location and status of all shipping crates and accelerometersInform her if crates/accelerometers are damagedHow many crates are available at this time?Plans for additional crates?Is plan in P6 OK?
9/10/2018
G. Ambrosio
5
MQXFA Fabrication L3 updates
HiLumi– GianLucaQXF Materials – Lance, Vito, IanQXF W&C – MiaoQXF R&I – Jesse, FredQXF Structure – Soren, Dan
9/10/2018
G. Ambrosio
6
Back up Slides
9/10/2018
G. Ambrosio
7

0